New product
Warning: Last items in stock!
Availability date:
This document is being revised to address new airworthiness authority rulemaking and guidance since the original issue of the document and to provide more comprehensive coverage of the subject, with a focus on the following areas:
• Requirements for CS-25/14 CFR Part 25, Appendix (App.) O and CS-25, App. P/14 CFR Part 33, App. D, associated regulatory changes, and means of compliance,
• New FIDS FUNCTIONS in relation with App. O and /or App. D/P conditions,
• Rationale between the FIDS response time requirements and the time requirement to annunciate presence of ice accumulation or icing conditions to ensure safe Aircraft operations,
• Comprehensive test conditions to verify the compliance of the FIDS FUNCTIONS with functional requirements,
• Guidance to analyze local FIDS conditions Vs Aircraft critical surfaces conditions e.g., critical temperature, freezing fraction, local installation factors, etc.
• Process/Guidance to verify FIDS performance when Installed on A/C
• Considerations for revised certification and qualification requirements,
• Specific considerations for the installation of FIDS on ROTORCRAFT.
Author | SAE |
---|---|
Editor | SAE |
Document type | Standard |
Format | File |
ICS | 49.090 : On-board equipment and instruments
|
Number of pages | 76 |
Replace | SAE AS 5498:2009-12-10 |
Set | AEROPAKS10U-10 |
Year | 2017 |
Document history | SAE AS 5498:2009-12-10 |
Country | USA |
Keyword | SAE 5498;SAE AS5498A;SAE AS5498A;SAE AS 5498 |